South Runway Expansion Project

 
Relocate trees 1,369 relocated trees that will preserves mature canopy for shade and air purification 100
Recycle pavement 1,247 less dump trucks hauling material to the site (each truck holds 30 cubic yards) 70
Reduce emissions by reducing truck trips transporting fill material to site (accomplish by transporting via rail or reducing quantity required by at least 25%) 26,736 less dump trucks hauling material to the site 100
Erosion control measures implemented during construction 752 tons of soil prevented from entering waterways at 7.2 to over 1,000 tons/acre/year for construction activities 94
Install taxiway edge Light Emitting Diode (LED) lamps replacing incandescent lamps 36,361 KWH: Total Energy Consumption Reduction per Year 58
Install MSE Wall LED lights 11,491 KWH: Total Energy Consumption Reduction per Year 50
Install runway guard LED lights 79,065 KWH: Total Energy Consumption Reduction per Year 84
Install windcones LED lights 19,874 KWH: Total Energy Consumption Reduction per Year 77
Solar power LED flashers on barricades 585 6-volt Batteries Not Needed per Month 56
Room in runway structures for a bike lane along Perimeter Road and US 1 and along NE 7th Avenue and NE 10th Street Allows for safe travel by bicycles as an alternative to vehicular travel 0
Install solar powered cameras 1,226 KWH: Total Energy Consumption Reduction per Year  100

West Lake Park Wetland Mitigation

Erosion control along the shore banks .9 miles of erosion control measures for long term reduction in soil entering waterways 100
Temporary essential habitat protection 38 tons of soil prevented from entering waterways at 7.2 to over 1,000 tons/acre/year for construction activities 100
Invasive plant species removed 15.9 acres of seed source reduction for the spread of invasives 100