Current Activities

Construction Activities from March 20 - 25 and March 27- April 1 

Contractors will perform the following work:
    




Click on the image for a larger version.
View and/or print a larger Work Area Map (PDF).

Terminal 4 (Area 4)

  • Demolition work for the new Customs procession area.  
  • Installing the utilities, electrical, and communications for the new Customs processing area.
  • Installing a bag-recheck counter and handling system.
  • Installing apron drainage.
  • Installing the roof and walls on the eastern phase concourse level and the Customs area.
  • Installing terrazzo floors in the Baggage Claim area and by the ticket counters.

 Terminal 1 (Area 1)

  • Finishing the interior of Concourse A.
  • Installing terrazzo floor on the ticket counter level.
  • Building the Concession Hall between Concourses B and C.

Terminal 3 (Area 3)

  • Installing a baggage conveyor system.

Pedestrian Bridges

  • Installing the flooring and lighting.
  • Repairing the steel structure.
  • Refurbishing the terminal vestibule entrances to the bridges. 
  • Demo work on the garage vestibule canopies.

 

Look at a larger version of the Construction Area Map (PDF).

Required Plug-ins: PDF iconAdobe® Reader®