| Utility Connection Permit |
The Utility Connection Permit (UCP) process is the means by which Water and Wastewater Services (WWS) allows connections to or modifications of its wastewater collection system. The UCP is applicable only to those areas within WWS jurisdiction.
|
| Design Professional |
| WWS; Sewer Lateral; Pump Stations; Lift Stations; Gravity Sewer; Force Main |