• A view of the concrete frame of what will become the entry lobby to the new courthouse tower.
    A view of the concrete frame of what will become the entry lobby to the new courthouse tower. The tower itself is rising behind the lobby with six floors of the eventual twenty floors underway.
  • This view illustrates the attachment of the panels to the concrete building frame.
    The first panels of the precast concrete exterior skin of the building have now been installed. This view illustrates the attachment of the panels to the concrete building frame.
  • The fuel tank that will supply the building generators is being installed in its underground location.
    The fuel tank that will supply the building generators is being installed in its underground location.
  • Concrete block masonry installed with a heavy gauge detention door frame installed integrally with the masonry.
    Concrete block masonry is being installed in the interior of the 2nd floor which will become the prisoner holding area. A heavy gauge detention door frame being installed integrally with the masonry in the center of the photograph.
  • The first concrete superstructure elements of the County’s new 1,000-car parking garage have now been installed.

    The first concrete superstructure elements of the County’s new 1,000-car parking garage have now been installed.

  • The precast garage panel is  “flown” towards the elevator/stair tower.

    The precast garage panel is  “flown” towards the elevator/stair tower.

  • The new 1,000-Car parking garage is rising along South Andrews Avenue.

    The new 1,000-Car parking garage is rising along South Andrews Avenue. Work to erect the precast concrete structure has progressed rapidly from the north end of the site and has now begun on the south side as well. The historic Coca-Cola building will remain on the southwest corner of the site.

  • The new Broward County Courthouse continues to take shape as work is well underway on the 10th floor.
    The new Broward County Courthouse continues to take shape as work is well underway on the 10th floor. The installation of precast concrete exterior cladding is beginning to suggest the final appearance of the building on the lower floors.
  • May, 2013
    ​Aerial shot of work underway on the 7th floor.  Jail is to the left and 110 Tower is to the top right.
  • June, 2013
    ​The main lobby which visitors will enter daily is located in between the rising tower and the existing Courthouse located at the top right.