Skip navigation links
Permits A to Z
Homeowner
Contractor
Design Professional
Small Business
FAQs
About ePermits

 ePermit Details

Permit: Utility Connection Permit
Description:
The Utility Connection Permit (UCP) process is the means by which Water and Wastewater Services (WWS) allows connections to or modifications of its wastewater collection system. The UCP is applicable only to those areas within WWS jurisdiction.
Audiences: Design Professional
Keywords: WWS; Sewer Lateral; Pump Stations; Lift Stations; Gravity Sewer; Force Main

Switch to Full Site   | Terms of use
Official Mobile Website of Broward County, Florida
The version of this site is best viewed on a mobile device.