The purpose of the Barrier Islands Greenway is to establish the corridor as one of the most desirable recreation corridors in the County. Continuous multipurpose paths along the beach, the A1A roadway itself and various neighborhood streets will link public beaches, resorts, waterside communities, activity centers, marinas, restaurants, municipal centers and other attractions. Through the use of the appropriate signs and other markers, the Barrier Islands Greenway has the potential to be the premier attraction in South Florida - further enhancing the unique sense of place along the corridor, as well as being an asset to each local neighborhood.

Potential Development Costs
The Barrier Islands Greenway Cost
1. Roadway Construction
Various Locations
+$8,400,000
2. Local Links
Various Locations
+$3,300,000
3. Beachside Facilities
Deerfield Beach
+$350,000
4. Future Wide Path
Deerfield Beach
+$150,000
5. Roadway Reconstruction
Hillsboro Beach
+$5,300,000
6. Roadway Restriping
Various Locations
+$400,000
7. Roadway Narrowing
Various Locations
+$3,700,000
8. Connect to Future Facilities
Lauderdale-by-the-Sea
+$100,000
9. Connect to Existing Facilities
Hillsboro Beach
+$400,000
10. Ft. Lauderdale Beach Section
+$150,000
11. Alternate Local Links
Various Locations
+$3,700,000
12. Beachside Path
Ft. Lauderdale
+$500,000
13. Bridge Crossing
Ft. Lauderdale
+$1,100,000
14. Other Local Links
Various Locations
+$800,000
15. Beachside Path
Hollywood
+$400,000
Grand Total
*=Does not include land aquisition costs if applicable or design costs; costs computed using 2001 dollars; estimates for conceptual use only.
+$28,750,000*