|
Resource Recovery System Schedule of
Rates, Fees and Charges
| WASTE-TO-ENERGY FACILITIES-As of October 1, 2007 |
|
Processable Waste
|
$93.65 per ton
|
| BROWARD INTERIM CONTINGENCY LANDFILL - As of October 1, 2001 |
|
Non-Processable Waste
|
$50.00 per ton
|
|
Construction and Demolition Material
|
$30.00 per ton
|
|
Yard Trash
|
$50.00 per ton
|
|
Clean Mulch
|
NOT being accepted until further notice.
|
|
Recycled paper Residue
|
NOT being accepted until further notice.
|
|
Trailers (mobile homes)
|
$10.00 per foot
|
|
Boats and trailers
|
$5.00 per foot
|
|
Tires (all sizes)
|
$110.00 per ton
|
|
Cars
|
$2.00 each
|
|
Station Wagons/Mini Vans
|
$2.00 each
|
|
Mini-or Mid-Size Pickup Trucks (6' bed or smaller)
|
$50.00 per ton
|
|
Full-Size Pickup Trucks (bed larger than 6')
|
$50.00 per ton
|
|
Weighing/Certifying Fee
|
$6.00 per official weight
|
|
Additional Service Hours
|
Actual Cost plus 15%
|
|
Emergency Service Hours
|
Actual Cost plus 15%
|
|
Special Handling Fees
|
As set by the Board of County Commissioners
|
|
Duplication of Weigh Tickets
|
$ 3.00 per ticket
|
|
Delinquent Fee (authorized credit accounts only)
|
1½% per month of delinquent amount due
|
|
Dishonored Checks (authorized credit accounts only)
|
$25 on checks up to $49.99; $30 on checks between $50.00 and $299.99; $40 or 5% (whichever is greater) on checks $300.00 and above.
|
|
Reinstatement of Charge Priviledges
|
$50 for insurance and $150 for Non-payment and Insufficient Security Deposit |
*Construction and Demolition Debris means "materials generally considered to be not water soluble and nonhazardous in nature, including, but not limited to, steel, glass, brick, concrete, or asphalt roofing material, pipe, gypsum wallboard, and lumber, from the construction or destruction of a structure as part of a construction or demolition project, and including rocks, soils, tree remains, trees, and other vegetative matter which normally results from land clearing or land development operations for a construction project..." Chapter 403.703 (17) F.S.
SUBJECT:
Capacity at Broward County Solid Waste Facilities
SERVICE AREA:
Broward County, excluding the cities of Dania, Hallandale, Pembroke Pines, Pompano Beach and Parkland.
CURRENT CAPACITY (in tons):
- 1.6 million tons/year (two waste-to-energy facilities @ 2,250 tons/day)
- 3,800,000 cu. yd. at the Broward Interim Contingency Landfill (BIC)
- Central Disposal Sanitary Landfill, owned/operated by Waste Mgmt., provides additional backup capacity on an as-needed basis in accordance with contractual agreement
CONTRACTUAL REQUIREMENTS (WHEELABRATOR FACILITIES):
1,095,000 tons per year.
CURRENT DEMAND:
1,000,000 tons per year. ± 30,000 tons per year at BIC
FUTURE CAPACITY:
Each waste-to-energy facility is expandable by 33%. A third location is reserved at the Broward County Landfill. There are no current plans for expansion
LOCATION OF FACILITIES:
PROCESSABLE WASTE (burnable)
Wheelabrator South Broward, Inc.
4400 South State Road 7
Ft. Lauderdale
(between I-595 & Griffin Road)
Wheelabrator North Broward, Inc.
2600 N.W. 48th Street
Pompano Beach
(next to Central Disposal Landfill)
NON-PROCESSABLE WASTE (non-burnable)
Broward Interim Contingency Landfill
U.S. 27 & Sheridan Street
Ft. Lauderdale
RATES:
$93.65/ton - Processable
$50.00/ton - Non-Processable
OTHER MAJOR IN-COUNTY FACILITIES:
Central Disposal Sanitary Landfill
3000 N.W. 48th Street
Pompano Beach
(private landfill owned/operated by Waste Management)
|